Pot and LED Tests
Design > Procedures > LED Procedures
Pot and LED Tests
Here are some quick and simple tests of
the LEDs and pots using the system. Each "test" is complete
it itself. You can start with any one that you choose.
The hardware configurations for tests
#1 through #8 are identical. The LED board is connected at Position
D. The S1025 command resets most of the settings. The S1003 command
selects the LED. The other commands are identical.